The Fore River Station is an 800MW plant and included three circuits of 1400mm2 CU 115kV cable with two conductors per phase. The plant end of these cables terminated into GIS equipment while the three utility termination points were open air.
Raytheon / Sithe Energies
US Mystic Station 345kV and 115kV and Fore River Station 115kV Projects, MAThis project involved the high voltage interconnect for two power plants in the Boston, Massachusetts area. The Mystic Station is a 1600MW plant with two interconnect voltages. The first included three circuits of 630mm2 CU 345kV cable. The plant end of the line was terminated with open air terminals and the utility side was terminated with GIS terminals. The second interconnect at the Mystic plant involved three circuits of 1400mm2 CU 115kV cable with three conductors per phase. The plant end of these cables terminated into GIS equipment while two of the three utility termination points were open air and the third was a GIS.